Rigging Practices Test Practice

Session length

1 / 20

Which signal indicates stop?

The signal for stop

Stopping requires a clear, unambiguous instruction to halt all actions. The signal for stop is the instruction that tells everyone to stop moving immediately, so the load stays secure and the work area remains safe. Move slow is about easing the pace, not stopping. Hoist commands lifting the load, and boom up commands raising the crane arm. Therefore, the stop signal uniquely communicates a halt, making it the correct choice.

The signal for move slow

The signal for hoist

The signal for boom up

Next Question
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy